Case Studies
- Full site clearance across a 3 acre site
- Access roads and site preparation
- Strip out to shell and core
- Asbestos removal
- Demolition of a 6 storey building
- Demolition of multiple structures
- Ground remediation and basement works
- On site crushing and reuse of materials
- Dual contract at The Crescent and Atlas House, City of London
- 11 week programme in a live urban environment
- Full internal strip out to shell and core
- Removal of existing MEP plant
- Asbestos removal works
- Temporary site services and alarms installed
- Hoarding, power supplies and CCTV installed
- Materials removed and stored for reuse
- Localised demolition works
- New service riser formation
- Roof demolition works
- Bespoke temporary structural support
- Below ground drainage installation
- New structural steel for openings
- Structural steel for roof extension
- Concrete and masonry remedial works
- New skate park construction with drainage and attenuation
- Themed playground with specialist equipment
- Below ground attenuation and French drains
- Resin surfacing and hardstanding areas
- Toilet and catering facilities installed
- CCTV infrastructure and utility connections
- Landscaping with permeable paths and planting
- New route to the Covid memorial peace garden
- Dual enabling works contract for international hotel group
- Complete strip out back to shell & core (listed building)
- 10 week programme with 60+ operatives mobilised
- Installation of temporary services, fire & intruder alarms
- Full R&D asbestos survey & licensed removal
- MEP plant drain down & removal works
- Heritage protection & internal hoarding installations
- 5,000 raised access floor tiles removed & rehomed (200+ pallets)
- Enabling works including soft strip & partial demolition
- Demolition of 1,500m² slab & hard standings
- Formation of pad foundations, ground beams & external slabs
- Construction of lift pit, ramps, stairs & French drainage system
- Base works for 55t structural steel gantry (design & install)
- Architectural staircases, handrails & galvanised mesh flooring
- New cantilevered slab, drainage & structural steel extension
- Excavation & installation of new service trenches under RF controls
- Full internal strip out back to existing structure
- Removal of ceilings, walls & floor finishes
- Validation & isolation of existing services
- Works delivered within live, occupied demise
- Close coordination with neighbouring contractors
- Emergency services maintained throughout programme
- Site specific logistics strategy with GF hoarding installation
- Modified split shifts for controlled waste movements
- Internal strip out of existing M&E plant across entire demise
- Controlled demolition of AHUs, pumps & AC equipment
- Removal of associated ductwork from roof to basement (9 floors)
- External scaffold & hoist logistics to restricted pit lane access
- Internal material distribution via goods lift & gantries
- Out-of-hours working to protect neighbouring occupiers
- On-site fabrication & installation of GRP to risers
- Full internal strip out back to shell & core
- Removal of partitions, doors, linings, ceilings & floor finishes
- Decommissioning & removal of all services, including lifts
- Careful hand removal of paint to retain exposed brickwork
- MEPH validation & isolation of existing services
- Coordinated asbestos removal & ASB5 notification for AIB
- Basement trial pits, window samples & opening-up investigations
- Early structural budgeting, sequencing & programme support